Physical Address
304 North Cardinal St.
Dorchester Center, MA 02124
Physical Address
304 North Cardinal St.
Dorchester Center, MA 02124
Jihan Wu -Bitcoin Mining Company, Bitdeer, bought 19 hectares near Fox Creek, Albert, for $ 21.7 million, providing a website permit of 101 MW. The company plans to build a natural gas power plant and 99 MW Bitcoin Mining Data Center. The construction of the power plant will require an additional $ 90 million, while investments at the Data Center are estimated at $ 30 million. This expansion is stronger the goal of Bitdeer to become a completely integrated mining company, managing its own infrastructure, energy production and Asic chips for effective bitcoin mining operations.